Search results

Your search found 1479 results.

Filter your search results using the options below:

Manufacturer
Gauge
Category
Digital features
 
Era
 
Number of items to display per page: 5 | 10 | 20 | Show All
R60162
MHA 'Coalfish' Ballast Wagon, EWS
'OO' Gauge
Released: 25/04/22
Era 8
Our Price:
£22.94
R60163
MHA Ballast Wagon, Three Pack, Ex EWS
'OO' Gauge
Released: 25/04/22
Era 8
Our Price:
£65.69
R40038
BR, Mk3 Sleeper Coach, E10654
'OO' Gauge
Released: 16/05/22
Era 7
Our Price:
£40.49
R40038A
BR, Mk3 Sleeper Coach, E10611
'OO' Gauge
Released: 16/05/22
Era 7
Our Price:
£40.49
R40038B
BR, Mk3 Sleeper Coach, E10723
'OO' Gauge
Released: 16/05/22
Era 7
Our Price:
£40.49
R40039
BR, Mk3 Sleeper Coach, 10660
'OO' Gauge
Released: 16/05/22
Era 8
Our Price:
£40.49
R40039A
BR, Mk3 Sleeper Coach, 10594
'OO' Gauge
Released: 16/05/22
Era 8
Our Price:
£40.49
R40039B
BR, Mk3 Sleeper Coach, 10685
'OO' Gauge
Released: 16/05/22
Era 8
Our Price:
£40.49
R30089
Transport for Wales, Class 67, Bo-Bo, 67014
'OO' Gauge
Released: 10/06/22
DCC Ready (8 Pin)
Era 11
A total of thirty Class 67 locomotives were built between 1999 and 2000 by Alstom, in Spain, for English, Welsh & Scottish Railway (EWS). These Bo-Bo configured diesel electric locomotives have a large fuel capacity, electro-pneumatic brakes and a top speed of 125mph (200km/h). The bodyshell is a monocoque load bearing Alstom design, whilst the bogies, also designed by Alstom, are of an 'H' frame design. The engine, traction motors and control electronics are the same as those used in the Class 66, but differ in that the traction motors are frame mounted, rather than axle hung, to reduce unsprung mass. The gear ratios have also been increased, allowing higher speeds and the cab is designed around a central driving position. The Class 67 locomotives are able to supply electric head-end power for passenger train heating and air-conditioning and are equipped for buffer and screw coupling, as well as also coupling via a buckeye coupler, attached on a swing arm mount. Locomotive number 67014 was built in March 2000 for EWS. In 2008 the locomotive was repainted silver and grey and operated for Wrexham & Shropshire under the name 'Thomas Telford'. The locomotive also operated Chiltern Railways services before eventually being repainted into its current Transport for Wales livery and preforming services hauling a rake of Mk4 coaches.
Our Price:
£174.59
R60421
20T Brake Van, LMS
'OO' Gauge
Released: 13/06/22
Era 3
Our Price:
£22.04
32-613
Class 90 90026 BR InterCity (Mainline)
'OO' Gauge
Released: 15/06/22
DCC Ready (21 Pin)
Era 8
Fifty Class 90 locomotives were ordered by British Rail in 1986 to replace the ageing Class 85 fleet on West Coast Main Line duties, whilst also allowing BR to cascade a number of Class 86s to East Anglia. Constructed at British Rail Engineering Limited, Crewe, the new locomotives were initially classified as 87/2s however this was soon changed to Class 90 as the design featured a completely new body-shell – although much of the technology within was shared with the Class 87s. Construction of the 110mph rated locomotives was completed in 1990 and the fleet was split between different sectors of British Rail – 15 were allocated to InterCity services, five for Rail Express Systems (mail and parcels traffic) and the remaining 30 for Railfreight Distribution. Most of those allocated to Railfreight Distribution would later be downgraded to 75mph and reclassified as 90/1s numbered in the 901xx series following work to isolate the Electric Train Heating and push-pull equipment making them dedicated freight locos. Upon privatisation the Class 90 fleet was split between Virgin Trains, EWS and Freightliner. By 1999 all of the Class 90/1s acquired by EWS had been converted back to 90/0s due to an increased requirement for passenger locomotives to work contracted ScotRail sleeper trains and for hire to GNER for East Coast Main Line services. Further renumbering by EWS occurred when nine locos were fitted with different brake blocks and these became Class 90/2s numbered in the 902xx series. The Freightliner locos were also converted back to their original specification in the early 2000s. The Class 90s have carried numerous liveries including three decorated in European liveries for the Freightconnection event in 1992 which coincided with the opening of the Channel Tunnel to freight services. No. 90128 was decorated in SNCB turquoise (Belgium), No. 90129 in DB red (Germany) and No. 90130 in SNCF orange and grey (France) and each carried the name Freightconnection in their respective languages, alongside No. 90022 which was named ‘Freightconnection’ and carried Railfreight Distribution livery. The majority of the Class have carried names whilst in service and the 90s have appeared a variety of other post-Privatisation liveries such as GNER, DB Schenker, First ScotRail, One (Anglia), Greater Anglia, National Express, DRS and Malcolm Logistics. Today, Class 90s remain in operation with Freightliner, DB Cargo UK (ex-EWS/DB Schenker) and most recently Locomotive Services which has acquired Nos. 90001 and 90002 and repainted them into InterCity Swallow livery for use on charters and excursions.
Our Price:
£195.45
32-619
Class 90 90030 'Crewe Locomotive Works' EWS
'OO' Gauge
Released: 15/06/22
DCC Ready (21 Pin)
Era 9
Fifty Class 90 locomotives were ordered by British Rail in 1986 to replace the ageing Class 85 fleet on West Coast Main Line duties, whilst also allowing BR to cascade a number of Class 86s to East Anglia. Constructed at British Rail Engineering Limited, Crewe, the new locomotives were initially classified as 87/2s however this was soon changed to Class 90 as the design featured a completely new body-shell – although much of the technology within was shared with the Class 87s. Construction of the 110mph rated locomotives was completed in 1990 and the fleet was split between different sectors of British Rail – 15 were allocated to InterCity services, five for Rail Express Systems (mail and parcels traffic) and the remaining 30 for Railfreight Distribution. Most of those allocated to Railfreight Distribution would later be downgraded to 75mph and reclassified as 90/1s numbered in the 901xx series following work to isolate the Electric Train Heating and push-pull equipment making them dedicated freight locos. Upon privatisation the Class 90 fleet was split between Virgin Trains, EWS and Freightliner. By 1999 all of the Class 90/1s acquired by EWS had been converted back to 90/0s due to an increased requirement for passenger locomotives to work contracted ScotRail sleeper trains and for hire to GNER for East Coast Main Line services. Further renumbering by EWS occurred when nine locos were fitted with different brake blocks and these became Class 90/2s numbered in the 902xx series. The Freightliner locos were also converted back to their original specification in the early 2000s. The Class 90s have carried numerous liveries including three decorated in European liveries for the Freightconnection event in 1992 which coincided with the opening of the Channel Tunnel to freight services. No. 90128 was decorated in SNCB turquoise (Belgium), No. 90129 in DB red (Germany) and No. 90130 in SNCF orange and grey (France) and each carried the name Freightconnection in their respective languages, alongside No. 90022 which was named ‘Freightconnection’ and carried Railfreight Distribution livery. The majority of the Class have carried names whilst in service and the 90s have appeared a variety of other post-Privatisation liveries such as GNER, DB Schenker, First ScotRail, One (Anglia), Greater Anglia, National Express, DRS and Malcolm Logistics. Today, Class 90s remain in operation with Freightliner, DB Cargo UK (ex-EWS/DB Schenker) and most recently Locomotive Services which has acquired Nos. 90001 and 90002 and repainted them into InterCity Swallow livery for use on charters and excursions.
Our Price:
£195.45
37-951E
Conflat Wagon BR Bauxite (Early) With BR Crimson BD Container [WL]
'OO' Gauge
Released: 22/06/22
Era 4
Our Price:
£25.15
37-954A
Conflat Wagon BR Bauxite (Early) With 'Pickfords' BD Container [WL]
'OO' Gauge
Released: 22/06/22
Era 4
Our Price:
£25.15
37-975B
Conflat Wagon GWR Grey With 'GWR' AF Container [W, WL]
'OO' Gauge
Released: 22/06/22
Era 3
Our Price:
£26.95
37-978A
Conflat Wagon BR Bauxite (Early) With BR Ice Blue AF Container [WL]
'OO' Gauge
Released: 22/06/22
Era 5
Our Price:
£25.95
371-004B
Class 08 08721 'Starlet' BR Red Star Express Parcels
'N' Gauge
Released: 22/06/22
DCC Ready (Next18)
Era 8
The first diesel shunters were pioneered by the LMS which began trialling designs during the 1930s. It soon became apparent that this form of traction offered many advantages over the steam locomotive – the former being ‘ready to use’ as and when required, whereas steam locos had to be kept at the ready even when not required immediately – with the obvious staffing and fuel costs associated with doing so. By the time of Nationalisation in 1948, the LMS had built various shunters and the 12033 series was adopted by BR as the basis for a new standard design of diesel-electric shunting locomotive. As a stop gap whilst the Class 08 was being developed, BR constructed further 12033 series locomotives and these would later be designated as Class 11s. Production of the 08s began in 1952 with the first example, No. 13000, entering traffic in 1953. Construction continued until 1962 and during the ten year period, 996 locomotives were built making the Class 08 the most numerous of all British locomotive classes. In addition, construction of the near-identical Class 09s (26 examples) and Class 10s (171) took the total well above a thousand – the former differed in having higher gearing whilst the latter had different engines and transmission. Built ‘in-house’ at BR’s Crewe, Darlington, Derby, Doncaster and Horwich Works, the 08s were allocated across the BR regions, with many being based at major stations and terminals where stock was marshalled and positioned ready for service, where trains were divided or merged, and of course at many freight facilities. Although they had a top speed of just 15 mph, what the 08s lacked in speed they more than made up for with tractive effort which was more than double that of the 03s and 04s. Although the first example was withdrawn in 1967, just four had gone prior to the introduction of TOPS and despite an ever-decreasing need for shunting locomotives, around a quarter of the Class remained in traffic at the start of the 21st century. Upon Privatisation of British Rail in 1994, EWS inherited many of the survivors, with others going to passenger operators for use as depot shunters. More than a decade later EWS was still operating over 40 of the shunters, with many more in store. Even today, Class 08s can still be found earning their keep at numerous depots, freight facilities and railway workshops. Meanwhile, ever since the first withdrawals Class 08s have been popular machines with heritage railways and today, more than 70 have found a new lease of life in preservation – often carrying out similar tasks to those for which they were designed some seven decades ago.
Our Price:
£123.20
371-004BSF
Class 08 08721 'Starlet' BR Red Star Express Parcels With DCC Sound
'N' Gauge
Released: 22/06/22
DCC Fitted
DCC Sound
Era 8
SOUNDS F1 - Engine Start-up / Shut-down F2 - Brake F3 - Single Horn (Speed Related) F4 - Double Horn F5 - Cold Start / Light Load F6 - Engine Idle / Coasting F7 - Speed Lock F8 - Exhauster (Vacuum Train Brakes) F9 - Flange Squeal (Speed Related) F10 - Guard’s Whistle F11 - Buffer Clash F12 - Coupling F13 - Compressor F14 - Sanders F15 - Handbrake F16 – Fuel Transfer Pump F17 - Wagon Snatching & Buffering F18 - On - Cab Door Open / Off - Cab Door Closed F19 - Fade All Sounds F20 - 'Draw Up’ F21 - ‘Squeeze Up’ F22 - 'I’m Going Under’ F23 - Window Wipers F24 - Station Ambience F25 - Spirax Valves F26 - Shunting Mode F27 - Volume Down F28 - Volume Up Analogue Users: Directional lights and basic Prime Mover (engine) sounds, which vary with speed, plus any other automated sounds, can be enjoyed when using this model on analogue control (DC) straight from the box!
Our Price:
£208.20
371-005A
Class 08 08950 'Neville Hill 1st' BR InterCity (Swallow)
'N' Gauge
Released: 22/06/22
DCC Ready (Next18)
Era 8
CLASS 08 HISTORY The first diesel shunters were pioneered by the LMS which began trialling designs during the 1930s. It soon became apparent that this form of traction offered many advantages over the steam locomotive – the former being ‘ready to use’ as and when required, whereas steam locos had to be kept at the ready even when not required immediately – with the obvious staffing and fuel costs associated with doing so. By the time of Nationalisation in 1948, the LMS had built various shunters and the 12033 series was adopted by BR as the basis for a new standard design of diesel-electric shunting locomotive. As a stop gap whilst the Class 08 was being developed, BR constructed further 12033 series locomotives and these would later be designated as Class 11s. Production of the 08s began in 1952 with the first example, No. 13000, entering traffic in 1953. Construction continued until 1962 and during the ten year period, 996 locomotives were built making the Class 08 the most numerous of all British locomotive classes. In addition, construction of the near-identical Class 09s (26 examples) and Class 10s (171) took the total well above a thousand – the former differed in having higher gearing whilst the latter had different engines and transmission. Built ‘in-house’ at BR’s Crewe, Darlington, Derby, Doncaster and Horwich Works, the 08s were allocated across the BR regions, with many being based at major stations and terminals where stock was marshalled and positioned ready for service, where trains were divided or merged, and of course at many freight facilities. Although they had a top speed of just 15 mph, what the 08s lacked in speed they more than made up for with tractive effort which was more than double that of the 03s and 04s. Although the first example was withdrawn in 1967, just four had gone prior to the introduction of TOPS and despite an ever-decreasing need for shunting locomotives, around a quarter of the Class remained in traffic at the start of the 21st century. Upon Privatisation of British Rail in 1994, EWS inherited many of the survivors, with others going to passenger operators for use as depot shunters. More than a decade later EWS was still operating over 40 of the shunters, with many more in store. Even today, Class 08s can still be found earning their keep at numerous depots, freight facilities and railway workshops. Meanwhile, ever since the first withdrawals Class 08s have been popular machines with heritage railways and today, more than 70 have found a new lease of life in preservation – often carrying out similar tasks to those for which they were designed some seven decades ago.
Our Price:
£123.20
371-010
Class 08 08441 RSS Railway Support Services
'N' Gauge
Released: 22/06/22
DCC Ready (Next18)
Era 9
CLASS 08 HISTORY The first diesel shunters were pioneered by the LMS which began trialling designs during the 1930s. It soon became apparent that this form of traction offered many advantages over the steam locomotive – the former being ‘ready to use’ as and when required, whereas steam locos had to be kept at the ready even when not required immediately – with the obvious staffing and fuel costs associated with doing so. By the time of Nationalisation in 1948, the LMS had built various shunters and the 12033 series was adopted by BR as the basis for a new standard design of diesel-electric shunting locomotive. As a stop gap whilst the Class 08 was being developed, BR constructed further 12033 series locomotives and these would later be designated as Class 11s. Production of the 08s began in 1952 with the first example, No. 13000, entering traffic in 1953. Construction continued until 1962 and during the ten year period, 996 locomotives were built making the Class 08 the most numerous of all British locomotive classes. In addition, construction of the near-identical Class 09s (26 examples) and Class 10s (171) took the total well above a thousand – the former differed in having higher gearing whilst the latter had different engines and transmission. Built ‘in-house’ at BR’s Crewe, Darlington, Derby, Doncaster and Horwich Works, the 08s were allocated across the BR regions, with many being based at major stations and terminals where stock was marshalled and positioned ready for service, where trains were divided or merged, and of course at many freight facilities. Although they had a top speed of just 15 mph, what the 08s lacked in speed they more than made up for with tractive effort which was more than double that of the 03s and 04s. Although the first example was withdrawn in 1967, just four had gone prior to the introduction of TOPS and despite an ever-decreasing need for shunting locomotives, around a quarter of the Class remained in traffic at the start of the 21st century. Upon Privatisation of British Rail in 1994, EWS inherited many of the survivors, with others going to passenger operators for use as depot shunters. More than a decade later EWS was still operating over 40 of the shunters, with many more in store. Even today, Class 08s can still be found earning their keep at numerous depots, freight facilities and railway workshops. Meanwhile, ever since the first withdrawals Class 08s have been popular machines with heritage railways and today, more than 70 have found a new lease of life in preservation – often carrying out similar tasks to those for which they were designed some seven decades ago.
Our Price:
£123.20